Skip to main content
Loading…
This section is included in your selections.

All materials shall be readily available to the job site and provisions shall be made to complete the construction in one continuous operation. Failure to comply shall result in work in the right-of-way being halted until such time as the conditions are corrected. (Ord. 2726 § 20, 2008; Ord. 462, 1969)