A. City Installation. The city may elect to install meters up to two inches in size.

B. Installation by Developer. When it is determined by the director of public works that placement of the service line would best be served by installation by the developer, the developer shall assume the cost of installing such service line.

C. Water Main Connection Permit Required. If it is necessary for a developer to tap into a city-owned main, then a permit for a water main connection shall be submitted to the department of public works for processing as required by LMC 2.44.040. (Ord. 2249 § 3, 1999; Ord. 2241 § 7, 1999; Ord. 1631 § 6, 1988; Ord. 1505 § 1, 1986; Ord. 1222 § 1, 1982; Ord. 1193 § 1, 1981; Ord. 800 § 1, 1975; Ord. 780 § 6, 1975; Ord. 416 § 3.02, 1968)