Skip to main content
Loading…
This section is included in your selections.

All existing and new businesses that discharge or have the potential to discharge wastes regulated by this chapter shall be required to complete an industrial waste disclosure form. The disclosure to be made by the discharger shall be made on written forms provided by the city and shall include such data, information and drawings as may be identified by the director. The disclosure forms must be returned to the director no later than within 30 days (except as noted below) of the occurrence of any of the following:

A. Receipt by the user of a disclosure form with a request for completion and submittal of same from the director;

B. Modification of any of the processes regulated by an existing permit which results in any changes in characteristics, volume, or point of discharge from those specified in the existing permit. The disclosure form must be submitted no later than 60 days prior to the expected modifications;

C. Addition of a process which is regulated by national categorical pretreatment standards or addition of a discharge which is subject to local discharge regulations; or

D. Application for a building permit for initial construction, expansion, or remodeling. The disclosure form must be submitted for review before the building permit is issued.

Disclosure forms shall be reviewed by the city, and if the director makes the determination that a wastewater discharge permit is required, the disclosure form shall serve as a permit application and must be accompanied by the fee designated in Chapter 14.40 LMC.

Disclosure forms must be completed and signed by a principal executive officer of the company. (Ord. 3220 § 2, 2016; Ord. 2742 § 2, 2008; Ord. 1705, 1989)