Skip to main content
Loading…
This section is included in your selections.

The city may require development of a slug discharge control plan. The city will make the determination annually whether a significant industrial user needs a slug discharge control plan as per 40 CFR Part 403.8(f)(2)(vi). If a slug discharge control plan is required, the following elements shall be included:

A. Description of discharge practices, including nonroutine batch discharges;

B. Description of stored chemicals;

C. Procedures for immediately notifying the POTW of slug discharges, including any discharge that would violate a prohibition under 40 CFR 403.5(b) with procedures for follow-up written notification within five days; and

D. If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. (Ord. 3220 § 2, 2016)