3.104.130 LMC Title 13 fees and charges.
The fees and charges set forth in Table 3.104.130 are the city of Lynnwood fees and charges related to the provisions of LMC Title 13.
LMC TITLE 13 – WATER |
||
---|---|---|
Cross-Connection Control Permit |
Single-family, excluding irrigation systems permitted under LMC Title 15 |
$132.00 |
Multifamily or commercial, per device |
$313.00 |
|
Fire Hydrant Inspection Permit |
$544.00 |
|
Fire Hydrant, Metered Water Consumption |
Per 100 cubic feet |
$5.85 |
Per 1,000 gallons |
$7.00 |
|
Fire Hydrant, Nonmetered Water Consumption |
Minimum charge |
$475.00 |
Fire Hydrant, Use Permit |
Administration fee, plus |
$544.00 |
Damage deposit |
$470.00 |
|
Purity Tests |
Per test |
$271.00 |
One test of purity on any main extension will be made without charge so long as the test can be made in coordination with a routine group of purity tests. |
||
Storm Drainage Permits |
First 100 lineal feet, plus |
$806.00 |
Per additional 100 lineal feet or portion thereof |
$518.00 |
|
Initial connection (to include one manhole, new or existing) |
$1,631.00 |
|
Per additional manhole |
$1,631.00 |
|
Retention/Detention System |
$1,625.00 |
|
Roof or Foundation Drain Installation Permit, Residential |
Greater than 50 feet |
$544.00 |
50 feet or less, or connection to existing within 50 feet |
$200.00 |
|
Water Meter, Installed by Developer |
Equal to 85% of fee for meters installed by city forces, for meters 2" or less |
|
3/4" meter |
$3,674.00 |
|
1" meter |
$4,549.00 |
|
1-1/2" meter (short, less than 25') |
$5,700.00 |
|
1-1/2" meter (long) |
$7,759.00 |
|
2" meter (short, less than 25') |
$6,180.00 |
|
2" meter (long) |
$8,310.00 |
|
Over 2" (installed by developer), cost of meter and appurtenances, plus |
$2,432.00 |
|
Water Main Connection Permit |
$1,625.00 |
|
Water Main/Service Permit |
First 100 lineal feet, plus |
$816.00 |
Per additional 100 lineal feet or portion thereof |
$518.00 |
|
Water Service Permit, Private |
New service (each) – Commercial, SFR, plat or short plat |
$404.00 |
Repair or replacement of water lines between the meter and building (greater than 25') |
$200.00 |
|
Repair or replacement of water lines between the meter and building (25' or less) |
$105.00 |
|
Reinspection Fee |
Work concealed without inspection or work not ready at time of inspection will be charged a reinspection fee |
$185.00 |
(Ord. 3451 § 3 (Exh. C), 2023; Ord. 3383 § 3 (Exh. C), 2020; Ord. 3237 § 2 (Exh. A), 2016)