3.104.160 LMC Title 16 fees and charges.
The fees and charges set forth in Table 3.104.160 are the city of Lynnwood fees and charges related to the provisions of LMC Title 16.
LMC TITLE 16 – BUILDING, SINGLE-FAMILY, ELECTRICAL AND GRADING FEES; |
||
---|---|---|
Fees are based upon the International Code Council Valuation Data Table for construction valuation or the International Building Code for square footage, whichever is greater. |
||
Building and Single-Family Permits |
||
Total Valuation Equal To: |
||
$1.00 – $1,000.00 |
Up to $1,000.00 |
$63.00 |
$1,001.00 – $2,000.00 |
First $1,000.00 plus |
$63.00 |
For each additional $100.00 or fraction thereof, up to and including $2,000.00 |
$5.00 |
|
$2,001.00 – $25,000.00 |
First $2,000.00, plus |
$110.00 |
For each additional $1,000.00 or fraction thereof, up to and including $25,000.00 |
$20.00 |
|
$25,001.00 – $50,000.00 |
First $25,000.00, plus |
$575.00 |
For each additional $1,000.00 or fraction thereof, up to and including $50,000.00 |
$14.00 |
|
$50,001.00 – $100,000.00 |
First $50,000.00, plus |
$933.00 |
For each additional $1,000.00 or fraction thereof, up to and including $100,000.00 |
$10.00 |
|
$100,001.00 – $500,000.00 |
First $100,000.00, plus |
$1,500.00 |
For each additional $1,000.00 or fraction thereof, up to and including $500,000.00 |
$8.00 |
|
$500,001.00 – $1,000,000.00 |
First $500,000.00, plus |
$4,743.00 |
For each additional $1,000.00 or fraction thereof, up to and including $1,000,000.00 |
$7.00 |
|
NOTE: For single-family residential solar energy systems, valuation shall be based on structural components and labor only. |
||
BUILDING PERMITS – OTHER INSPECTIONS AND FEES |
||
Multifamily Single-Use Water Heater (gas or electric) |
Including 4 fixtures/equipment |
$208.00 |
Per fixture/equipment over 4 |
$18.00 |
|
Demolition, Commercial/Multifamily |
$1,500.00 |
|
Demolition, Single-Family |
Primary building, and/or accessory building |
$179.00 |
Inspection, Adult Family Home |
Includes $185.00 fire inspection fee |
$357.00 |
Inspection, Minimum Site |
Commercial, residential and occupancy |
$185.00 |
Inspection, Miscellaneous/Other |
$185.00 |
|
Inspection, Overtime – Weekday Call Back |
Hourly, with 2-hour minimum* |
$185.00 |
Inspection, Overtime – Weekend/Holiday |
Hourly, with 4-hour minimum* |
$185.00 |
*Or the total hourly cost incurred by the city, whichever is greatest. The actual cost shall include wages, benefits, overhead, supervision, supplies and equipment of the employees involved. |
||
Inspection, Reinspection |
Work concealed without inspection or work not ready at the time of inspection will be charged a reinspection fee |
|
1st reinspection |
$185.00 |
|
2nd reinspection |
$370.00 |
|
3rd+ reinspection |
$555.00 |
|
Investigation, Stop Work Orders |
Amount equal to permit fee |
|
PLAN REVIEW FEES |
||
Fee applies to all permits requiring review, unless listed below |
65% of building or single-family permit fee |
|
Fee applies to commercial/multifamily plumbing and mechanical permits requiring review |
40% of plumbing/ mechanical fees |
|
Hourly, additional review required for changes, additions or revisions to approved plans, minimum 1 hour* |
$185.00 |
|
Overtime Plan Review |
Weekday overtime plan review: hourly, with 2-hour minimum |
$185.00 |
Weekend, holiday, or weekday call back: hourly, with 4-hour minimum |
$185.00 |
|
Expedited Plan Review |
Hourly, for projects up to $100,000 in construction value |
$185.00 |
Surcharge, for projects in excess of $100,000 in construction value |
70% of plan review fee |
|
Banner Permit |
Per occupancy |
$48.00 |
Solar System, Single-Family |
Per permitting checklist |
$185.00 |
Solar System, Commercial or Single-Family |
Not meeting the permitting checklist requirements |
Fee based on building permit valuation table requirements |
*Or the total hourly cost incurred by the city, whichever is greatest. The actual cost shall include wages, benefits, overhead, supervision, supplies and equipment of the employees involved. |
||
ELECTRICAL PERMIT FEES |
New Construction 10% of Building Permit Fee |
|
Inspection, Miscellaneous/Other |
$185.00 |
|
Inspection, Overtime – Weekday Call Back |
Hourly, with 2-hour minimum |
$208.00 |
Inspection, Overtime – Weekend/Holiday |
Hourly, with 4-hour minimum |
$208.00 |
Inspection, Reinspection |
1st reinspection |
$185.00 |
2nd reinspection |
$370.00 |
|
3rd reinspection |
$555.00 |
|
Investigation, Stop Work Orders |
Fee is 40% of the electrical permit fee or minimum charge, applies to all permits requiring review |
$48.00 |
Plan Review |
Hourly, additional review required for changes, additions or revisions to approved plans, with 1-hour minimum* |
$185.00 |
Overtime review, hourly, 1-hour minimum charge* |
$185.00 |
|
Expedited Plan Review |
Hourly, for projects up to $100,000 in construction value |
$185.00 |
Surcharge, for projects in excess of $100,000 in construction value |
70% of plan review fee |
|
ELECTRICAL – COMMERCIAL AND MULTIFAMILY (INCLUDES LOW VOLTAGE SOLAR SYSTEMS) |
||
Total Valuation Equal To: |
Up to $1,000.00 |
$71.00 |
$1,001.00 to $5,000.00 |
$107.00 |
|
Per additional $1,000.00 or fraction thereof |
$10.00 |
|
$5,001.00 to $20,000.00 |
$190.00 |
|
Per additional $1,000.00 or fraction thereof |
$21.00 |
|
$20,001.00 to $50,000.00 |
$445.00 |
|
Per additional $1,000.00 or fraction thereof |
$19.00 |
|
$50,001.00 to $250,000.00 |
$857.00 |
|
Per additional $1,000.00 or fraction thereof |
$12.00 |
|
$250,001.00 to $1,000,000.00 |
$3,334.00 |
|
Per additional $1,000.00 or fraction thereof |
$7.00 |
|
$1,000,001.00 and up |
$11,013.00 |
|
Per additional $1,000.00 or fraction thereof |
$5.00 |
|
Low Voltage Systems Including Security, Phones, Computers, Etc. |
10% of building permit fee |
$83.00 |
Service/Panel, Accessory Building or Structure Including Garages, Pools, Spas, and Outbuildings |
$207.00 |
|
Service/Panel, Primary Dwelling |
Up to 200 amps (including garage) |
$202.00 |
Over 200 amps (including garage) |
$292.00 |
|
ELECTRICAL – SINGLE-FAMILY, REMODEL AND SERVICE |
||
Circuits, Added/Altered – No Service Change |
Up to 10 circuits |
$119.00 |
Fee per additional circuit (up to maximum total fee of $200.00) |
$12.00 |
|
Low Voltage Systems |
Including security, phones, computers, etc. |
$83.00 |
Mast/Meter |
Repair or alteration |
$119.00 |
Service/Panel Alteration or Change |
Base fee (no added circuits), plus |
$119.00 |
Fee per added circuit (up to maximum total fee of $200.00) |
$12.00 |
|
Electrical – Solar, Single-Family |
||
Per Solar System Permitting Checklist |
Permit fee |
$208.00 |
Per Solar System Not Meeting Permitting Checklist |
Fee based on electrical permit valuation table |
|
ELECTRICAL – MISCELLANEOUS |
||
Installation Transfer/Switch |
Panel and residential generator |
$71.00 |
Service, Events (carnivals, art and street fairs, haunted houses, amusement rides, and other temporary events) |
Base fee, plus |
$71.00 |
Per concession |
$18.00 |
|
Service, Mobile/Manufactured Home |
Not including accessory buildings or structures |
$119.00 |
Service, Portable Classrooms |
$119.00 |
|
Service, Swimming Pools, Hot Tubs, Spas and Saunas |
$119.00 |
|
Sign Hook-Up |
Per sign |
$48.00 |
T-Stats, Commercial |
Base fee |
$48.00 |
Each additional T-stat over 1 |
$12.00 |
|
GRADING PERMIT FEE |
Administrative fee, plus inspection and plan review fees (50 cubic yards/38.2 m3 or less exempt) |
$563.00 |
50 cubic yards (38.2 m3) or less |
$35.00 |
|
51 to 100 cubic yards (40 m3 to 76.5 m3) |
$58.00 |
|
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) |
||
First 100 cubic yards (76.5 m3), plus |
$58.00 |
|
Each additional 100 cubic yards (76.5 m3) |
$29.00 |
|
1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) |
||
First 1,000 cubic yards (764.6 m3), plus |
$310.00 |
|
Each additional 1,000 cubic yards (764.6 m3) |
$25.00 |
|
10,001 to 100,000 cubic yards (7,646 m3 to 76,456 m3) |
||
First 10,000 cubic yards (7,645.5 m3), plus |
$519.00 |
|
Each additional 10,000 cubic yards (7,645.5 m3) |
$104.00 |
|
100,001 cubic yards (76,456 m3) or more |
||
First 100,000 cubic yards (76,455 m3), plus |
$1,467.00 |
|
Each additional 10,000 cubic yards (7,645.5 m3) |
$60.00 |
|
GRADING PLAN REVIEW FEES |
50 cubic yards (38.2 m3) or less |
– |
51 to 100 cubic yards (40 m3 to 76.5 m3) |
$38.00 |
|
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) |
$58.00 |
|
1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) |
$78.00 |
|
10,001 to 100,000 cubic yards (7,646 m3 to 76,456 m3) |
||
First 10,000 cubic yards (7,645.5 m3), plus |
$78.00 |
|
Each additional 10,000 cubic yards (7,645.5 m3) |
$40.00 |
|
100,001 to 200,000 cubic yards (76,456 m3 to 152,911 m3) |
||
First 100,000 cubic yards (76,455 m3), plus |
$431.00 |
|
Each additional 10,000 cubic yards (7,645.5 m3) |
$23.00 |
|
200,001 cubic yards (152,912 m3) or more |
||
First 200,000 cubic yards (152,911 m3), plus |
$643.00 |
|
Each additional 10,000 cubic yards (7,645.5 m3) |
$12.00 |
|
Structure Moving Permit |
Base fee, plus |
$917.00 |
Preinspection up to 2 hours |
$208.00 |
(Ord. 3451 § 6 (Exh. F), 2023; Ord. 3383 § 6 (Exh. F), 2020; Ord. 3307 § 3 (Exh. C), 2018; Ord. 3237 § 2 (Exh. A), 2016)